№76-6
New method for determining the parameters of drilling and blasting for raising mine workings
M. Kononenko1, O. Khomenko1, A. Kosenko2, V. Bash1
1 Dnipro University of Technology, Dnipro, Ukraine
2 Branch for Physics of Mining Processes of the M.S. Poliakov Institute of Geotechnical Mechanics of the National Academy of Sciences of Ukraine, Dnipro, Ukraine
Coll.res.pap.nat.min.univ. 2024, 75:63–80
Full text (PDF)
https://doi.org/10.33271/crpnmu/76.063
ABSTRACT
Purpose. Development of new methods for calculating the parameters of drilling and blasting (D&B) for raising mine workings using the methods of blast-hole and well charges, taking into account the pressure of the explosion products, the compressive strength of rocks, their structural structure, fracturing and compaction under the influence of rock pressure.
The methodology of research. To develop methods for calculating the parameters of D&B when carrying out raising with the help of blast-hole and well charges, we used the well-known laws of the theory of elasticity and the basic provisions of the quasi-static wave hypothesis of the mechanism of destruction of a solid medium by an explosion. To determine the zones of inelastic deformations due to changes in the stress-strain state of the rock mass in the face of the rock riser during the explosion, numerical modeling the parameters of D&B calculated using the new method was carried out using the finite element method in the software product for engineering analysis SolidWorks Simulation.
Findings. Methods have been developed for calculating the parameters of D&B for carrying out raising mine workings using the methods of blast-hole and well charges. It has been established that the calculation the parameters of the D&B is carried out in the same sequence as when carrying out horizontal mine workings, but differs in that when carrying out raising there is no group of breakout blast-holes or wells. This is due to the fact that the cross-sectional area of the risers is of small importance. In the proposed methods, the distance between blast-holes or wells in a cutting is determined by the radius of the crushing zone, and for contour ones - by the radius of the intensive crushing zone. To check the calculated parameters of the D&B, using a new method, during the excavation of risers, in the conditions of the “Yuvileina” mine of PJSC “Sukha Balka”, numerical modeling of changes in the stress-strain state of the rock mass under the influence of an explosion was carried out. According to the results of numerical modeling, the formation of areas of inelastic deformation in the face of the rising under explosive load, uniform crushing of the rock was obtained, which will avoid the release of oversized pieces after the explosion.
The originality. The location of blast-holes or wells in the face of the raise can be determined by the power-law dependence of the change in the line of least resistance (LLR) on their diameter, the pressure of the explosion products, the compressive strength of rocks, their structural structure, fracturing and compaction under the influence of rock pressure.
Practical implications. The developed methods for determining the parameters of D&B for carrying out the risers methods of blast-hole and well charges make it possible to rationalize the location of blast-holes or wells in the face, which will lead to resource saving during their implementation.
Keywords: blast-hole, well, raise, explosive, drilling and blasting, zone of intensive crushing, line of least resistance.
References
1. Khomenko, O., Kononenko, M., & Savchenko, M. (2018). Technology of underground mining of ore deposits. http://doi.org/10.33271/dut.001
2. Kosenko, A., & Tarasyutin, V. (2022). Substantiation of rational technologies for carrying out preparatory-throwed rais in the mining blocks of iron mines, which ensure increased stability of the massif exposures. JOURNAL of Donetsk Mining Institute, 1, 40–46. https://doi.org/10.31474/1999-981X-2022-1-40-46
3. Khomenko, O., Kononenko, M., & Lyashenko, V. (2021). Improvement of safety for the underground vertical workings. Occupational Safety in Industry, (2), 41–48. http://doi.org/10.24000/0409-2961-2021-2-41-48
4. Fedorenko, P.I., Melnikova, I.Ye., Chepurnyi, V.I., Liash, S.I. (2015). Pro mozhlyvosti znyzhennia trudovykh enerho- ta resursovytrat pid chas pidhotovky blokiv do ochysnykh robit. Zbirnyk naukovykh prats Naukovo-doslidnoho hirnychorudnoho instytutu Derzhavnoho vyshchoho navchalnoho zakladu Kryvorizkyi natsionalnyi universytet, (55), 152–156.
5. Fedorenko, P.I., Chepurnyi, V.I., Liash, S.I. (2016). Analiz stanu prokhodky pidniattievykh vyrobok pid chas pidhotovky na shakhtakh Kryvbasu blokiv do ochysnoho vyimannia. Zbirnyk naukovykh prats Naukovo-doslidnoho hirnychorudnoho instytutu Derzhavnoho vyshchoho navchalnoho zakladu Kryvorizkyi natsionalnyi universytet, (56), 103–108.
6. Usatyi, V.Yu., Kistrin, S.H., Blizniukov, V.H. (2001). Prokhodka pidniattievykh hirnychykh vyrobok v umovakh ZAT «Zaporizkyi ZRK». Zbirnyk naukovykh prats DNDHRI, 64–71.
7. Usatyi, V.Yu., Kistrin, S.H., Usatyi, V.V. (2001). Obgruntuvannia sposobu provedennia pidniattievykh hirnychykh vyrobok pry systemakh rozrobky vysokymy kameramy. Naukovyi visnyk NHAU, (3), 18–21.
9. Lyashenko, V., Vorob’ev, A., Nebohin, V., Vorob’ev, K. (2018). Improving the efficiency of blasting operations in mines with the help of emulsion explosives. Mining of Mineral Deposits, 12(1), 95-102. https://doi.org/10.15407/mining12.01.095
10. Kholodenko, T., Ustimenko, Y., Pidkamenna, L., & Pavlychenko, A. (2014). Ecological safety of emulsion explosives use at mining enterprises. Progressive Technologies of Coal, Coalbed Methane, and Ores Mining, 255–260. http://doi.org/10.1201/b17547-45
11. Mironova, I., & Pavlichenko, A. (2013). Analysis of air pollution levels during underground ore mining. Mining of Mineral Deposits, 7(3), 261–266. http://doi.org/10.15407/mining07.03.261
12. Mironova, I., & Borysovs’ka, O. (2014). Defining the parameters of the atmospheric air for iron ore mines. Progressive Technologies of Coal, Coalbed Methane, and Ores Mining, 333–339. http://doi.org/10.1201/b17547-57
13. Myronova, I. (2015). The level of atmospheric pollution around the iron-ore mine. New Developments in Mining Engineering 2015, 193–197. http://doi.org/10.1201/b19901-35
14. Myronova, I. (2015). Changing of biological traits of winter wheat that vegetate near emission source of iron-ore mine. Mining of Mineral Deposits, 9(4), 461–468. http://doi.org/10.15407/mining09.04.461
15. Myronova, I. (2016). Prediction of contamination level of the atmosphere at influence zone of iron-ore mine. Mining Of Mineral Deposits, 10(2), 64–71. https://doi.org/10.15407/mining10.02.0064
16. Khomenko, O., Kononenko, M., Myronova, I., & Sudakov, A. (2018). Increasing ecological safety during underground mining of iron-ore deposits. Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu, (2), 29–38. http://doi.org/10.29202/nvngu/2018-2/3
17. Kholodenko, T., Ustimenko, Y., Pidkamenna, L., & Pavlychenko, A. (2015). Technical, economic and environmental aspects of the use of emulsion explosives by ERA brand in underground and surface mining. New Developments in Mining Engineering 2015, 211–219. http://doi.org/10.1201/b19901-38
18. Kononenko, M., Khomenko, O. (2021). New theory for the rock mass destruction by blasting. Mining of Mineral Deposits, 15(2), 111–123. https://doi.org/10.33271/mining15.02.111
19. Kononenko M., Khomenko O., Sadovenko I., Sobolev V., Pazynich Yu., Smolinski A. (2023). Managing the rock mass destruction under the explosion. Journal of sustainable mining, 22(3), 240-247. https://doi.org/10.46873/2300-3960.1391
20. Kononenko, M., Khomenko, O., Cabana, E., Mirek, A., Dyczko, A., Prostański, D., Dychkovskyi, R. (2023). Using the methods to calculate parameters of drilling and blasting operations for emulsion explosives. Acta Montanistica Slovaca, 28(3), 655–667. https://doi.org/10.46544/ams.v28i3.10
21. Kononenko M., Khomenko O., Kovalenko I., & Savchenko M. (2021). Control of density and velocity of emulsion explosives detonation for ore breaking. Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu, (2), 69-75. https://doi.org/10.33271/nvngu/2021-2/069
22. Kononenko M., Khomenko O., Kovalenko I., Kosenko A., Zagorodnii R., Dychkovskyi R. (2023). Determining the performance of explosives for blasting management. Rudarsko-Geološko-Naftni Zbornik, 38(3), 19–28. https://doi.org/10.17794/rgn.2023.3.2
23. Shvab’iuk, V.I. (2016). Opir materialiv. Kyiv: Znannia.
24. Voroshchuk, V.Ya., Vitenko, T.M. (2021). Solidworks u zavdanniakh 3D modeliuvannia ta inzhynirynhu tekhnichnykh system. Ternopil: FOP Palianytsia V.A.
25. Shashenko, O.M. (2002). Mekhanika hirskykh porid. Dnipropetrovsk: NHU.