ABSTRACT

Purpose. To determine the efficiency of the technological scheme for the development of titanium-zirconium deposits with a full cycle of heavy fraction processing in terms of the volume of hydrohaulage work and the required area of tailings storage.

The methods. The analytical research method was used for theoretical generalizations and the formulation of research conclusions. The graphical method was used to determine the parameters of the technological scheme for a full cycle of heavy-fraction processing of titanium-zirconium deposits. Comparative methods allowed us to determine the influence of pit productivity on indicators of hydrohaulage work volume and the required area for tailings storage in a technological scheme with a full-cycle ore processing.

Findings. It was established that the proposed scheme, with a full cycle of heavy-fraction processing of titanium-zirconium deposits, reduces the volume of hydrohaulage work by 14% in the area between the stationary enrichment plant and the tailings storage by including the enrichment tailings processing shop in the operating cycle. It was determined that, with an increase in the pit's productivity to 4.0 million m3, the volume of hydrohaulage work would be reduced from 88 to 77 million km·m3 over 10 years of the mining and processing plant's operation.

The originality. The dependence of the tailings storage facilities areas and hydraulic dumps on the productivity of the mining enterprise was established, which allows us to determine that when using a scheme with a collective concentrate factory on the pit slope top, the area of the tailings storage facility will be 14.4–22.9 hectares, while the proposed scheme, with an additional processing plant for enrichment tailings, allows us to reduce the area for placing host rocks by 11–12%.

Practical implementation. The obtained research results allow us to establish that the proposed scheme with a full cycle of the heavy fraction processing allows us to achieve a comprehensive effect, which consists in obtaining additional marketable products of titanium-zirconium components, increasing the level of resource conservation by reducing electricity costs, reducing the volume of technical water consumption for hydrohaulage work, and reducing the area of tailings facilities.

Keywords: pit, titanium-zirconium deposits, critical raw materials, resource conservation, technologies with a full cycle of ore processing, hydrohaulage work.

References

1. Lozhnikov, O.V., Shustov, O.O., Chebanov, M.O. & Perkova, T (2022). Methodological principles of the selection of a resource-saving technology while developing water-bearing placer deposits.Mining of Mineral Deposits, (16), 115–122. https://doi.org/10.33271/mining16.03.115

2. Lozhnikov, O., Sobko, B., Pavlychenko A. (2023). Technological Solutions for Increasing the Efficiency of Beneficiation Processes at the Mining of Titanium-Zirconium Deposits. Inzynieria Mineralna, 2023, (1), pp. 61–68. http://doi.org/10.29227/IM-2023-01-07

3. Hrinchenko, O., & Yushin, O. (2019). Potential of mining waste recycling in Ukraine. In Monitoring 2019. European Association of Geoscientists & Engineers. Vol. 2019, No. 1, pp. 1-5. https://doi.org/10.3997/2214-4609.201903172

4. Singh, S., Maurya, P., Karmakar, A., Maurya (2025). Mining tailings as a frontier for sustainable nanomaterials: advancing circular economy and environmental innovation. Environmental Geochemistry and Health, 47(7), 265. https://doi.org/10.1007/s10653-025-02566-x

5. Lozhnikov O.V. (2026) Faktory vplyvu na vtraty tytan-tsyrkoniievykh mineraliv pry rozrobtsi karieru z vykorystanniam zbahachuvalnoi fabryky kolektyvnoho kontsentratu. XXIV Mizhnarodna naukovo-tekhnichna konferentsiia Rozvytok promyslovosti ta suspilstva”. Kryvyi Rih. 27-29 travnia 2026. s. 84. https://www.knu.edu.ua/konferencii/mizhnarodna-naukovo-tehnichna-konferenciya-nauka-promyslovist-suspil-stvo-2026-r

6. Kinnunen, P. H. M., & Kaksonen, A. H. (2019). Towards circular economy in mining: Opportunities and bottlenecks for tailings valorization. Journal of cleaner production, 228, 153–160. https://doi.org/10.1016/j.jclepro.2019.04.171

7. Sobko, B., Lozhnikov, O., & Drebenshtedt, C. (2020). Investigation of the influence of flooded bench hydraulic mining parameters on sludge pond formation in the pit residual space. In E3S Web of Conferences (Vol. 168, p. 00037). EDP Sciences. https://doi.org/10.1051/e3sconf/202016800037

8. Oliynik, T., Lyashenko, V., Dudar, T., & Oliynik, M. (2024). Increasing the Efficiency of Titanium-Iron ORE Enrichment Through Using New Type Separators. Mining Revue/Revista Minelor, 30(4). https://doi.org/10.2478/minrv-2024-0061

9. Hrinchenko, O., & Yushin, O. (2019). Potential of mining waste recycling in Ukraine. In Monitoring 2019 (Vol. 2019, No. 1, pp. 1-5). European Association of Geoscientists & Engineers. https://doi.org/10.3997/2214-4609.201903172

10. Bubnova, O., Mishchenko, T., & Buniaieva, I. (2024). Current condition, distribution and probable reserves of mineral raw materials in technogenic objects of the mining industry of Ukraine. Геотехнічна механіка, (171), 59–73. https://doi.org/10.15407/geotm2024.171.059

11. Lechner, M., Gerold, E., & Flachberger, H. (2025). Processing of Ukrainian Ilmenite-bearing Heavy Sands as a Contribution to Improving Europe’s Self-supply in Critical Raw Materials from Its Own Deposits: Presentation of a PhD-Project. BHM Berg-und Hüttenmännische Monatshefte, 170(6), 351–356. https://doi.org/10.1007/s00501-025-01600-w

12. Adamchuk, A., Pavlychenko, A., Shustov, O., & Bondarenko, A. (2024). Research of land-saving schemes of mining the horizontal sedimentary mineral deposits. IOP Conference Series: Earth and Environmental Science, 1319(1), 012012.https://doi.org/10.1088/1755-1315/1319/1/012012

13. Zhai, J., Wang, H., Chen, P., Hu, Y., & Sun, W. (2020). Recycling of iron and titanium resources from early tailings: From fundamental work to industrial application. Chemosphere, 242, 125178. https://doi.org/10.1016/j.chemosphere.2019.125178


date of first submission of the article to the publication 04/09/2026
date of acceptance of the article for publication after review – 05/15/2026
date of publication  06/30/2026